Positioned
8th Feb 2022
The oxygen generator has reached its final position on the slab. A 2nd crane was needed to manoeuvre it into place. Heavy rain and wet ground continued to hamper operations and the 2nd crane also got stuck in the mud. But Chitambo colleagues showed typical fortitude and overcame all these challenges.
Additional tenting and security measures are in place until the walls are completed.
Congratulations to all and thank you to Mr Norman Mukuma, Nursing Officer, for the photos.